Summary of 13 control points for hydropower pre-buried
Electrical
1. The height of the switch should be 1.4 meters, with a clearance of 150 to 180 mm from the floor.
2. The evacuation indicator should be installed 0.5 meters above the ground, while the safety exit sign on the door should be placed 200 mm from the floor.
3. The height for both strong and weak electrical outlets for the TV should be 1 meter, with a spacing of 0.5 meters between them.
4. The air conditioning outlet should be positioned at 2 meters high, while the socket on the bedside table should be 0.65 meters. The telephone and network interface should be placed at 0.3 meters from the ground.
5. The visual intercom interface should be installed at 1.5 meters above the floor.
6. The power supply for the temperature control valve should be at 0.65 meters, and the control panel should be located at 1.4 meters.
7. The refrigerator socket in the kitchen should be placed at 1.5 meters, while other sockets should be at 0.5 meters.
8. The socket for the gas water heater in the kitchen should be at 1.5 meters, with the remaining sockets also placed at 1.5 meters.
9. The electric water heater in the bathroom should be installed at 2.3 meters, and the washing machine socket should be at 1.5 meters.
Plumbing
1. The spacing between hot and cold water pipes:
- For the washing basin and washbasin, the spacing should be 200 mm.
- For the gas water heater, electric water heater, shower, and bathtub, the spacing should be 150 mm.
- The elevation for the washing basin and washbasin should be 450 mm.
- For the gas water heater and electric water heater, the elevation should be 1.2 meters.
- The shower should be at 1.15 meters, and the bathtub should be at 650 mm.
- The washing machine should be placed at 1.2 meters from the floor.
- The horizontal position should follow the drawing. If no dimensions are provided, measurements will be confirmed by Party A.
2. The location of each drainage pipe (such as the toilet and floor drain) must be reserved according to the layout in the drawing.
3. When installing the main drainage pipeline, it is important to consider whether a swirl joint is needed to prevent clogging and ensure smooth flow.
4. All materials used must be from contracted brands, including pipes, fittings, pre-embedded casings, elbows, tees, and pipe clamps.
Waterproof RGB LED Dance acrylic Floor Display Screen for Wedding Party
Â
These interactive display walls are applied in different purposes. This is a perfect audio/visual solution for commercial or
business purposes as well as for the educational purposes. It is often used for providing information to the viewers or audiences in the most interactive and effective way .
prospective customers. The interactive LED can be used IN retail stores, restaurants and other commercial spaces for giving information about their services and products.
1.Aluminum Structure Light Weight,good heat dissipation, good weather resistance, convenient transportation.
2.Imported PC Protrctive Surface, High Permeability, Strong Impact Resistance, Good anti-slip Effect
3.Strong Load Capacity The center of the panel has a load-bearing pivot,with a single panel bearing more then 1.2tons
Â
Dance LED Display,Flexible Led Screen,Indoor Led Display Screen,Led Church Screen
Guangzhou Chengwen Photoelectric Technology co.,ltd , https://www.cwleddisplay.com