Withstand voltage tester panel instructions
1, the power switch;
2. Start button: When pressed, the test light is on, and the instrument outputs high voltage;
3. Reset button: When pressed, the test light is off, there is no high voltage output at this time;
4, voltage adjustment knob: adjust the size of the output voltage, the counterclockwise direction is small, and vice versa;
5, test light: the light is on, indicating that the high voltage has been activated, the light is off and the high voltage is disconnected;
6. Ultra-leakage lamp: The lamp is on, indicating that the object under test is not qualified for breakdown.
7. High voltage output terminal: AC high voltage output terminal;
8. Grounding terminal: Connect the test grounding wire;
9, voltmeter: output voltage indication;
10, time timer: 1s ~ 99s timing adjustment, you can set the required test time value;
11. Leakage current range selection switch: switch the leakage current indication current meter range, according to the switch status, respectively, 0~2mA range and 2mA~20mA range;
12, leakage current preset / test switch: press the switch, you can set the leakage current alarm value, bounce switch, in the normal state is the test state, the leakage current value can be detected in real time through the "leakage current indicating ammeter"; , leakage current indicating ammeter: according to the "leakage current range switch" position, correspondingly indicate 0 ~ 2mA value and 2mA ~ 20mA value;
14. Leakage current preset adjustment knob: Press the preset switch to continuously set the leakage current 0.3mA~2mA alarm value and 2mA~20mA alarm value;
15. Withstand voltage tester timer switch: press the switch, adjust the timer to test the time, pop up the switch, the timer does not work, it is manual;
16. Remote control socket: plug in the remote control plug on the high voltage bar and press the switch on the high voltage bar to remotely control the instrument;
17. Time display window: display time.
2. Start button: When pressed, the test light is on, and the instrument outputs high voltage;
3. Reset button: When pressed, the test light is off, there is no high voltage output at this time;
4, voltage adjustment knob: adjust the size of the output voltage, the counterclockwise direction is small, and vice versa;
5, test light: the light is on, indicating that the high voltage has been activated, the light is off and the high voltage is disconnected;
6. Ultra-leakage lamp: The lamp is on, indicating that the object under test is not qualified for breakdown.
7. High voltage output terminal: AC high voltage output terminal;
8. Grounding terminal: Connect the test grounding wire;
9, voltmeter: output voltage indication;
10, time timer: 1s ~ 99s timing adjustment, you can set the required test time value;
11. Leakage current range selection switch: switch the leakage current indication current meter range, according to the switch status, respectively, 0~2mA range and 2mA~20mA range;
12, leakage current preset / test switch: press the switch, you can set the leakage current alarm value, bounce switch, in the normal state is the test state, the leakage current value can be detected in real time through the "leakage current indicating ammeter"; , leakage current indicating ammeter: according to the "leakage current range switch" position, correspondingly indicate 0 ~ 2mA value and 2mA ~ 20mA value;
14. Leakage current preset adjustment knob: Press the preset switch to continuously set the leakage current 0.3mA~2mA alarm value and 2mA~20mA alarm value;
15. Withstand voltage tester timer switch: press the switch, adjust the timer to test the time, pop up the switch, the timer does not work, it is manual;
16. Remote control socket: plug in the remote control plug on the high voltage bar and press the switch on the high voltage bar to remotely control the instrument;
17. Time display window: display time.
Fork Type Terminals,Insulated Bullet Sockets Terminals,Insulated Bullet Terminals,Type Fork Insulate Terminal
Taixing Longyi Terminals Co.,Ltd. , https://www.longyicopperterminals.com